Early plans
The idea of building a bridge across the Avon Gorge originated from William Vick's bequest of £1,000 in 1753, to be invested until it grew to £10,000 and then used to build a stone bridge between Clifton Down and Leigh Woods. Vick, a wealthy Bristol wine merchant, left the money to the Society of Merchant Venturers, stipulating that the bridge should be built of stone and should be free to cross. Although the money accumulated, by the 1820s it had reached only around £8,000 and estimates for a stone bridge were many times that amount. Various schemes were considered, including one by the engineer Thomas Telford, who had been consulted about improving the harbour at Bristol, but his proposals were not pursued.
An alternative plan to construct an iron suspension bridge gained support, as it would be much cheaper than a stone structure. In 1829 the Merchant Venturers transferred responsibility for Vick's fund to a committee formed to promote a bridge, and an Act of Parliament was obtained in 1830 authorising the project and the levying of tolls. Isambard Kingdom Brunel, then a young engineer who had come to Bristol in connection with other work, prepared designs at his own expense. He initially proposed a suspension bridge with a span of about 870 feet (265 m) and later developed more elaborate schemes, including one with towers in the form of Egyptian-style pylons.
Design competition
A competition for the design was announced in 1829, and Telford was appointed as the judge. Telford rejected all the entries, including Brunel's, and put forward his own design for a suspension bridge supported by tall Gothic towers. This proposal was criticised as impractical and excessively expensive, and a second competition was held in 1830. The entries were assessed by Davis Gilbert and John Seaward, and Brunel's design was declared the winner on 16 March 1831. His revised scheme had a central span of 702 feet (214 m), with a deck carried on wrought-iron chains suspended between two towers, one founded on the rock of the Leigh Woods side and the other on the Clifton side. Brunel described the project as his "first child" and "darling".
The design was influenced by the need to provide sufficient clearance for shipping and by the steep sides of the gorge. Brunel's plans included decorative Egyptian-style features on the towers, such as sphinxes and hieroglyphic ornament, but these were omitted from the completed bridge. The height of the deck above high water was intended to be about 245 feet (75 m), giving a total height of roughly 331 feet (101 m) to the highest point of the structure above the water.
Construction
Construction began with the laying of the foundation stone on 21 June 1831. Work had barely started when it was disrupted by the Bristol riots of October 1831, which followed the rejection of the Reform Bill by the House of Lords. The disturbances damaged confidence in Bristol and made it difficult to raise money. Work resumed, and by 1834 some £30,000 had been spent, but further funds could not be obtained. The towers were left unfinished, construction ceased in 1843, and in 1853 the ironwork was sold to pay debts. Some of the chains were subsequently used in Brunel's Royal Albert Bridge at Saltash.
Brunel died in 1859 without seeing the bridge completed. As a memorial to him, the Institution of Civil Engineers formed a committee to revive the project, and William Henry Barlow and John Hawkshaw prepared revised designs based on Brunel's scheme. They retained the general appearance and span but strengthened and modified the structure, providing three chains on each side instead of the two originally intended and altering details of the suspension system and deck. A new Act was obtained in 1860, and construction began in 1862. The ironwork was supplied by Galloways of Manchester.
To carry materials and workmen across the gorge, a wire was stretched between the two sides and a travelling platform was suspended from it. The towers were completed and the chains assembled link by link across the span, after which the deck was erected. The completed bridge was opened on 8 December 1864, with a procession and celebrations. It had cost substantially more than originally envisaged, and the towers were left with plain masonry rather than Brunel's proposed ornamentation.
Later history
The bridge was operated as a toll crossing, but its early finances were difficult because income was insufficient to cover both maintenance and the debts incurred during construction. In the 20th century increasing motor traffic placed greater demands on the structure, and weight and traffic restrictions were introduced to protect it. Major maintenance has included inspection and renewal of the chains, hangers, deck and masonry, as well as repainting and corrosion protection.
During the Bristol Blitz of the Second World War, the bridge survived without serious damage. It was illuminated for the Festival of Britain in 1951 and floodlighting has since been used on special occasions. The bridge was designated a Grade I listed building, recognising its exceptional architectural and engineering importance.
A major programme of restoration was undertaken in the late 20th and early 21st centuries. The bridge was closed to traffic for repairs at various times, and toll revenue continued to be used for its upkeep. The 150th anniversary of its opening was celebrated in December 2014 with a fireworks display. A visitor centre, explaining the history, construction and maintenance of the bridge, opened on the Leigh Woods side in 2015.